# Proof standard

> What counts as proof on this site: measured results, sourced statements and illustrative assumptions, how failures are published and how changes are dated.

Date: 2026-11-23
Source: https://szemat.pro/en/proof-standard/

This page explains what counts as proof on this site. Each kind of statement has its own rules.

## Measured result

A measured result comes from a real measurement. To be presented that way it needs five things: a baseline, a dated intervention, a person who owns the metric, an agreed measurement window and a validation.

If any of the five is missing, the figure is not presented as a result.

## Sourced statement

A sourced statement rests on a primary source: the official text, the original document or the study from whoever carried it out. Every source carries the date I accessed it.

Legal sources live in [the regulatory matrix](https://szemat.pro/en/regulatory-matrix/), each with its access date. The matrix prepares the conversation with your legal team; it does not replace it.

## Illustrative assumption

An illustrative assumption describes a scenario, not a fact. The model cases on this site are illustrative: they show how I would approach a problem, with stated ranges and assumptions, and they do not report a real project.

That is why every model case carries a label that says so and is written in the conditional. Nobody mistakes a scenario for a result.

## Failures are published as failures

A red measurement is published as it is measured, with its causes. The report card of the [AI agent for regulated industries](https://szemat.pro/en/evidence/ai-agent-regulated-industries/) shows a red verdict and what blocks promotion.

A red verdict is never deleted or rewritten as a success.

## How changes are recorded

Every change to this standard goes into the log below, with its date. An entry is never deleted: if a rule changes, a new entry explains it.

## Changelog

- 2026-11-22: first version of the standard.

## Registers by piece

### Cases

- [How would a bank lead its AI without a full-time Head of AI?](https://szemat.pro/en/cases/how-a-mid-sized-bank-could-lead-ai-without-a-full-time-head/#claims)
- [How would an insurer take its AI pilot to production?](https://szemat.pro/en/cases/how-would-an-insurer-take-a-genai-pilot-to-production/#claims)
- [Where should a clinic network start with AI?](https://szemat.pro/en/cases/where-should-a-clinic-network-start-with-ai/#claims)
- [How would a retailer take its AI assistant to production?](https://szemat.pro/en/cases/how-would-a-retailer-take-its-ai-assistant-to-production/#claims)
- [How would a logistics operator automate its documents?](https://szemat.pro/en/cases/how-would-a-logistics-operator-automate-its-documents/#claims)
- [Where would an industrial plant apply AI first?](https://szemat.pro/en/cases/where-would-an-industrial-plant-apply-ai-first/#claims)
- [How would a public body govern its use of AI?](https://szemat.pro/en/cases/how-would-a-public-body-govern-its-use-of-ai/#claims)

### Writing

- [What guardrails does AI need in regulated industries?](https://szemat.pro/en/writing/ai-guardrails-for-regulated-industries/#claims)
- [How do you evaluate an LLM agent before deployment?](https://szemat.pro/en/writing/how-to-evaluate-an-llm-agent-before-deployment/#claims)
- [Why do GenAI pilots fail to reach production?](https://szemat.pro/en/writing/why-genai-pilots-fail-to-reach-production/#claims)

### Evidence

- [AI agent for regulated industries](https://szemat.pro/en/evidence/ai-agent-regulated-industries/#claims)
- [Architecture decisions and governance of a regulated AI agent](https://szemat.pro/en/evidence/ai-agent-architecture-docs/#claims)
