A clinic network should start with AI by making a decision, not by picking a model. In this scenario I would not start by building. I would map every idea on the table, score each one against the same value and feasibility criterion, drop or bound in writing the ones that cannot tolerate their failure mode, and choose a single bet, with an owner and approved data, to test its feasibility before committing to a build.
Context: a clinic network with more ideas than criteria
The scenario is a mid-sized private clinic network with about 2,500 employees, subject to the regulation of the jurisdiction where it operates. The network wants to use AI and already has several ideas on the table: summarizing clinical records, managing appointment scheduling, coding billable services and answering patients. What it lacks is a way to decide which one to prioritize.
The regulatory frame raises the stakes of that decision. Most jurisdictions regulate patients’ rights, the confidentiality of the clinical record and health data, which are sensitive personal data. For example, Chile’s Law 20.584 (Regula los derechos y deberes que tienen las personas en relación con acciones vinculadas a su atención en salud) covers the clinical record, and Law 21.719 (Regula la protección y el tratamiento de los datos personales y crea la Agencia de Protección de Datos Personales) has an expected application date of 2026-12-01 (possibly 2027-10-15 if bill number 18.623-07, still pending and open to amendment, is published first). It is advisable to include both among the norms to validate with the compliance team. None of this forbids AI, but it does mean knowing, before starting, what data each idea would use, who may see that data and on what basis, and what would happen if the system got something wrong. In a clinic network that last point is not a technical detail: a scheduling error is a nuisance, while a wrong piece of clinical advice can harm a person.
That is why this is a Discovery case and not a build case. The AI Discovery Sprint for deciding where to use AI is meant for teams that want to use AI and need to decide where and how before investing in building. The question here is not how to make a system work, but which of these ideas deserves to exist, in what order and within what limits.
Diagnosis: enthusiasm and budget without a map to choose from
The starting point has one strength and one problem. The strength is that there is enthusiasm and budget: nobody at the network needs convincing that AI can help. The problem is that there is no opportunity map and no criterion for choosing, and in that vacuum the flashiest idea tends to win. In this scenario the flashiest idea is the clinical record summary, which is also the riskiest. On top of that, the clinical data are not ready to be used outside their source systems.
The first thing I would examine is the gap between what each idea promises and what it needs. A record summary promises to save clinical time, but it needs access to the most sensitive information the network holds, a way to check that the summary neither omits nor invents anything that matters, and a person who reviews it before it influences any decision. Scheduling promises less, but it may need less sensitive data and tolerate an error better. I would not jump to the answer: the scoring is the work, and doing it before looking at the data would repeat the very mistake the network is trying to avoid.
I would also look at who would adopt each case. An idea without someone who uses it and takes responsibility for it ends up orphaned even when it works technically, which is one of the reasons generative AI pilots fail to reach production. Asking during immersion who the clinical or business owner of each idea would be filters out a great deal before any technical test.
The table sums up the starting point and the stated target for this scenario across the five dimensions I would use to decide.
| Dimension | Starting point | Stated target |
|---|---|---|
| Opportunities identified | Several loose ideas, no shared map | An opportunity map scored by value and feasibility, covering every initial idea |
| Prioritization criterion | None agreed; the flashiest idea carries the most weight | One bet chosen with the same criterion applied to every idea |
| Available data and permissions | Clinical data not ready to be used outside their systems | The bet's feasibility proven in a spike or a light POC with approved data |
| Failure-mode tolerance | Not assessed; the flashiest idea is the riskiest | Cases with an intolerable failure mode dropped or bounded in writing |
| Who adopts and runs the case | Not defined for any idea | A named clinical or business owner who agrees the evaluation criterion |
Proposal: a blueprint for choosing a bet and its path to production
The proposal would follow the service’s published phases, immersion, opportunity mapping, prioritization, feasibility test and blueprint, and it would end in four deliverables the network could execute with me or without me. None of them is a report to be filed away: each one answers a question the network would have to answer anyway before building.
Diagnosis and use cases
The first deliverable is the opportunity map: each idea written up as a concrete use case, with the value it would move, the data it would need, its failure mode and who would adopt it. On top of that map I would apply a value and feasibility matrix, using the same criterion for every idea. The failure-mode filter comes before the matrix: an idea whose error can be neither tolerated nor bounded leaves the matrix in writing, with its reason, even if it is the most attractive one.
In this scenario the record summary would be the idea that most needs that filter. I would not rule it out in advance: it might end up bounded, for instance as a draft that a clinician always reviews, or it might fall out if its failure mode cannot be bounded with the data and people available. That decision would come out of prioritization, not out of a prior preference.
Value and feasibility matrix
- Initial ideas: every idea on the map, before any filter
- Intolerable failure mode: dropped or bounded in writing before scoring
- High value, high feasibility: candidates for the bet
- High value, low feasibility: prepare the data first
- Low value, high feasibility: park it or solve it without AI
- Low value, low feasibility: drop it
Proposed architecture for the chosen bet
For the chosen bet I would describe the architecture in text, as a container view in the C4 model: which source systems supply data, which component retrieves it and with what permissions, where the answer is generated, where the input and output controls act, where the reviewing person steps in and what gets logged. I would not draw the diagram at this stage, because the bet is not built yet and a drawing would give a false sense of a finished design.
Each structural decision would go into an architecture decision record, with its context, its alternatives and its consequences. It is the same format used to document the architecture and governance decisions of a regulated agent, where governance is mapped onto the system’s decisions. Here that mapping would have to include clinical record confidentiality and the handling of sensitive data from the very first decision, not as a review at the end.
Evaluation plan
The third deliverable is the criterion the network would later use to decide whether the bet moves to production. I would define it by dimension: whether answers are grounded in the source and cite it, whether the system refuses and escalates when it should, whether it withstands adversarial input, and whether cost and latency fit what the network can sustain. It is the approach described in how to evaluate an LLM agent before deployment, applied before building anything.
I would not set the thresholds myself. The clinical and business team would set them, because they know which errors are acceptable and they are the ones who would answer for them. My role would be to turn that criterion into something measurable, and into a set of test cases that represents it, including the cases where the right answer is not to answer at all and to hand over to a person.
Roadmap for the path to production
The last deliverable puts what comes next in order: what it would take to prepare the bet’s data, which architecture decisions remain open, what it would cost, when the evaluation criterion would be applied and which ideas on the map would be revisited later. The roadmap does not set a production date; it sets the conditions for getting there and the signals that would force a stop.
Assumptions for this scenario
- The network is a mid-sized private clinic network with about 2,500 employees, subject to the regulation of its jurisdiction.
- The starting ideas are clinical record summaries, appointment scheduling, coding of billable services and patient-facing assistance.
- The applicable frame is the rules of its jurisdiction on the clinical record, patients’ rights and sensitive health data.
- There is enthusiasm and budget, but the clinical data are not yet ready to be used outside their systems.
| Risk | Mitigation | Stop signal |
|---|---|---|
| Clinical data cannot be used for the test | Work with reviewed anonymized or synthetic data | No approved data when the feasibility test starts |
| The flashiest case takes over | Score every idea with the same criterion before choosing | The bet does not pass the feasibility criterion |
| Intolerable failure mode | Exclude clinical decisions and keep a person in the loop | The case requires the AI to decide about a patient |
| Nobody adopts the case | Name a clinical or business owner during immersion | No such owner exists when the bet is chosen |
Every stop signal is an acceptable outcome of the Discovery, not a failure. If AI is not the answer for an idea, I would say so in writing, and the network would be spared a build that should never have started.
How success would be measured: decisions that can be checked at the close
In this scenario success would not be measured with impact figures but with decision goals that can be checked at the end. A Discovery delivers a decision and a blueprint; promising an operational improvement would mean promising something this work does not produce. The four goals are the stated targets in the starting-point table:
- an opportunity map scored by value and feasibility that includes every initial idea, leaving none out by preference;
- one chosen bet with its feasibility proven in a spike or a light POC;
- an agreed evaluation criterion, with thresholds set by the clinical and business team, that would decide the move to production;
- the cases with an intolerable failure mode dropped or bounded in writing, each with its reason.
Measurement would be documentary and open to review. The map is checked by confirming that every initial idea appears, either scored with the same criterion or dropped by the failure-mode filter with its reason on record. Feasibility is checked against the outcome of the test on approved data, not against a demo. The evaluation criterion is checked because it exists in writing, has an owner and has thresholds that someone at the network signed off. That way nobody has to argue a dropped case again from scratch.
For this scenario I estimate 5 stages over roughly 4-6 weeks: immersion, opportunity mapping, prioritization, feasibility test and blueprint. It is an estimate for this case, under these assumptions, and not a standard duration of the service. It would change if approved data took longer to become available or if the owner of the bet did not emerge during immersion.